DANE COUNTY:     Tax amounts are online.  T  axpayers can also get E-Bills and E-Receipts by going to http://accessdane.co.dane.wi.us/ clicking on the Public Access oval, and entering Property Information. In the right hand column under tax information, Click on E-Bill or E-Receipt. E-bill reproduces the tax bill and E-receipt shows the payments made for tax amounts. 

 GREEN COUNTY :   Tax information is online by going to www.co.green.wi.gov  and clicking on the Land Records System tab on the right

 

 

 

Official Payments Logo
Water and Sewer Payment

Real Estate Property Tax Payment


Home > VILLAGE BOARD > Village Minutes

VILLAGE BOARD : Village Minutes

Selected Village Minutes
VILLAGE OF BROOKLYN
Jun 01, 2010
PDF Version: 2010-Jun-01-VILLAGE OF BROOKLYN.pdf

VILLAGE OF BROOKLYN
June 1, 2010 SPECIAL MEETING
The Special Village Board meeting was called to order by PresidentWalsten on June 1, 2010 at 6:37 pm. Trustees
present were Tim Belter, Steve Lust, Dean Van Den Eng, Todd Klahn. Trustee Natzke was absent. Others present were
Clerk Strause, PWDirector Anderson, Chief Barger, Josh Straka, Strand Engineering, Dan Rokicki.
Preliminary Resolution 2010-08 declaring intent to levy special assessment under municipal police power pursuant to
section 66.07 of Wisconsin Statutes was presented and approved per motion by Trustee Bruner, second Klahn, and
unanimously carried.
A PUBLIC HEARING was held at 6:38 pm underWis Stats 66.07 to Levy Special Assessments upon property within the
following area for benefits conferred upon such property by the replacement of curb and gutter: 201 Church St., 109
Hotel St., 104 Lincoln St., 202 N. Rutland Ave., 302 N. Rutland Ave., 204 N. Rutland., 308 N. Rutland Ave., 310 N.
Rutland Ave., 312 N. Rutland Ave., 314 N. Rutland Ave. Residents present for the hearing are Nick Kramer, Cleo Tilley,
Dorothy Frandy. Dane County last fall told the Village they would be repaving N. Rutland to the intersection with
Church St. When the street is done, Dane County will be turning over jurisdiction to the Village. Nick Kramer stated he
called the building inspector today because he wants to extend is driveway approach 6’ to the north during this
reconstruction project because he is unable to enter his driveway when entering with a trailer from the south. He
understood this would add to the cost of his assessment. The inspector said it would be OK and he agreed to pay the
entire cost of removing the existing apron staying the same width with the extension. Engineer Straka stated he will
relay the message to the contractor about the 6’ extension. Dorothy Frandy, 106 Bowman St., requested to close up
one of her driveways. This is not a part of the contracted project area; however, Dorothy stated she has a low area
where water sits in two spots. Cleo Tilley, representing the Methodist Church asked if the figure calculated for cost
was a final figure. Engineer Straka stated it would depend on the exact amount of curb and gutter removed/replaced
so the figure could be a little more or less. The Church has requested a sidewalk ramp that is not being used be
removed. All special assessments will have a ten year payment plan for this project. Straka also stated there is a steep
crown on N. Rutland in some areas and the County may be able to lower it a little. There being no other comments.
Trustee Bruner moved, second Klahn, carried to close the public hearing at 6:50 pm.
The Board reviewed the plans and specs for curb and gutter installation for N. Rutland including the addresses as
stated previously including the request by Nick Kramer to extend his driveway by 6’ to the north during this project.
Trustee Bruner called attention to the total curb and gutter cost on the engineer’s spreadsheet of $23 per L.F. x
footage with totals calculated at $22 per L.F. Josh stated he would correct the spreadsheet and the Clerk will send
letters to property owners explaining the error along with a copy of the final resolution. Final calculations still could
change based on final footage measured after the project is complete. A request by a property owner at 104 Lincoln
St. to hire a private contractor to do their curb and gutter work was discussed. There would be no warranty on the
work if a private contractor installed the c&g. The contractor the Village hires is responsible for the grade if there is a
problem or the c&g is not installed property. The Village has more control over the contractor they hire. Warranty
would also cover other properties that may be added to this contract upon individual request. Any other property
requesting to have c&g work done would need to pay the Village rather than pay directly to the contractor. Trustee
Klahn moved, second Bruner, carried to deny the request to hire a separate contractor for c&g work at 104 Lincoln.
Anderson will call the owner to explain the denied request. Trustee Bruner moved, second Lust, carried to approve
the plans and specs for curb and gutter work on N. Rutland noting the corrections to the pricing.
Final Resolution 2010-09 was presented in accordance with the Village of Brooklyn’s police power, pursuant to section
66.07 of the Wis. Stats, and pursuant to section 32.13 of the Village’s ordinances, authorizing curb and gutter removal
and replacement, and levy of special assessments upon certain property in the village benefited by the improvements.
Trustee Bruner moved, second Klahn, carried unanimously to approve the Resolution with corrections to cost.
Trustee Bruner moved, second Klahn, carried to award the contract for storm water project on Hotel St and curb and
gutter on N. Rutland Ave to R&K& Sons Construction, Evansville, at a cost of $162,971.00 which includes alternates 1
& 2.
Trustee Belter reported on loan proposals received from Bank of Brooklyn, Brooklyn Community Bank, and Board of
Commissioners of Public Lands. Trustee Belter moved, second Klahn, carried to approve the committee's
recommendation to finance the Hotel Street storm water project and N. Rutland curb and gutter work through the
low bidder Brooklyn Community Bank at 3.94% for ten years not to exceed $180,000 including engineering. Green
County matching road fund money will be used on this project. Clerk will ask the bank about prepayment penalties,
closing fee costs, and borrowing schedule so that there would be no payment due this year. Contract work is required
to be completed by Aug 15th.. Dane County has not awarded their contract yet for the repaving; not sure when they
will start their road project.
Allowing other properties that have requested to have their curb and gutter replaced, to be included in the N.
Rutland and Hotel Street project was discussed. The properties are 306 Second St., 224 Hotel St., and 106 Bowman St.
These properties would have the same payment schedule as the properties included in the project. Dorothy Frandy
would like to remove a driveway, replace curb & gutter only if it will correct the standing water problem. Straka stated
there may be low spots left after the installation as this area on Bowman St. is not a part of the street project.
Contract price is an advantage to property owners that have problems with drainage. Frandy stated her area has been
dug up a couple of times but the problem persists. Anderson stated it probably is not a water leak but unsure why
area settles. The street will be fixed in the area of the curb and gutter spots. Cost would be billed at $23 per L.F. with
a ten year pay back and interest accruing as all other special assessments for the Hotel St. project. Trustee Klahn
moved, second Bruner, carried to allow three extra properties that have requested replacement of their curb & gutter
under the Hotel St. contract providing the contractor agrees to this arrangement.
Trustee Bruner moved, second Klahn, carried to appoint Trustee Natzke to the Recreation Committee.
President Walsten moved, second Van Den Eng, carried to approve the Lions Club, Cub Scouts Pack 352, Methodist
Church, Stoughton FFA, and Mighty Mites as food vendors for the Bluegrass Festival. All organizations are non-profits.
Trustee Bruner moved, second Van Den Eng, carried to approve the job description for the part-time seasonal public
works employee.
Trustee Van Den Eng moved, second Lust, carried to approve Chapter 33, Disposal of Village Property. Finance
committee reviewed this Chapter many times and recommended approval.
Discussion continued regarding lawn meters for outside summer use to reduce sewer charges. PresidentWalsten
referred to a water/sewer rate report done by MSA showing Brooklyn at the second highest in the State within our
population range. Trustee Bruner stated the PublicWorks Committee recommends a pilot program using old/tested
meters that have been removed from homes for lawn meters, limiting the number to five for this year to determine
how much the administrative cost would be to do this in addition to Public Works employee time, and hardware to
adapt. The charge suggested was $15 per month. Analysis would be done at year end to see if the rate should be
raised or lowered to make it cost effective. Based on this formula, a resident would need to use more than 200 cf in
order to save anything on the $15 per month charge. Residents filling their swimming pools have been calling in the
reading before and after the filling. Anderson felt it would cost less than $10 for each meter to be set up. Sewer credit
would not be given until the meter is brought back to the Clerk's office. Dan Rokicki stated he has a pool to fill and
likes to keep his grass green. He further stated he does not really know how much he uses outside but would not want
to pay more in a rental fee than he would gain in sewer credits. Trustee Van Den Eng stated if the cost for set up of the
meter is minimal, we should keep the rental fee minimal. Rokicki said he may put in a permanent deduct meter based
on how much he uses outside when this year's metering is done.. Deposit for the meter will be $100 or whatever the
actual cost of the meter is. Pilot programwould end in September. Walsten stated this would give a small relief to
property owners. Trustee Van Den Eng Dean stated we should charge a reasonable monthly fee. Trustee Van Den Eng
moved, second Klahn, carried to set up 20 temporary lawn meters (sewer deduct) with deposit (returned when meter
is brought back) to be the actual cost of a new meter in addition to a $5 per month rental fee with Sept 30th being the
last day for meters to be returned to the Clerk's office, and sewer credit given on the next billing after return of the
meter. Meter checked in and out will be done at the Clerk’s office.
Trustee Bruner moved, second Van Den Eng, carried to adjourn at 8:12 pm.
Carol A. Strause, Village Clerk-Treas.